getfrp
INDEPENDENTLY AUDITED · TOOLING / NDT EQUIPMENT

Beijing Time Peak Technology Co., Ltd.

Beijing, ChinaScale tier: LargeEst. 20052 certifications on file

AT A GLANCE

Scale tier
Large
L
Region
Beijing
Beijing, China
Typical MOQ
1 unit
(category benchmark)
Lead time, FOB
30-60 days
(typical)
FOB price band
$2K-50K / unit
(NDT / fixtures / climate chambers)

MOQ / lead time / FOB ranges are category-level benchmarks from 2024-2026 actual deals, not a quote from this plant. Submit an RFQ for a plant-specific quote.

Beijing Time Peak Technology Co., Ltd. is a verified Chinese FRP tooling / ndt equipment auxiliary tooling and NDT equipment vendors — fixtures, ultrasound benches, climate chambers — operating out of Beijing province, founded in 2005. Independently verified business license, scale tier and certifications on file. Categorized as Large on the getfrp scale: established mid-cap producers with 10,000–50,000 tons annual capacity.

Beijing-based NDT instrument maker. Phased array and portable UT systems with composite-specific transducer ranges. Customer base spans aerospace, rail, and wind blade quality programs.

MODULE 01 · CAPABILITY

Products & finished goods

Phased array UT systemsPortable UT instrumentsComposite-specific probes
MODULE 02 · PROCESS

In-house forming processes

Process knowledge usually predicts quality risk better than scale does. Cross-check each named process against our process wiki for typical defect modes and inspection points.

NDT equipmentNon-destructive testing
MODULE 03 · EXPORT READINESS

Certifications on file

A certificate is necessary but not sufficient — always verify the scope (which products), the renewal status, and the issuing body's accreditation chain (CNAS / IAF / ANAB). See the export-readiness module for what each cert actually unlocks in your end-market.

ISO 9001
ISO 17025
MODULE 04 · COMPARE

Other verified Chinese tooling / ndt equipments

READY TO RFQ?

Let our China desk handle the sourcing conversation.

Submit a structured RFQ and our bilingual sourcing engineers will translate it into Mandarin, chase the sample, walk the floor for QA, and route the payment. The first thing they'll do is cross-check whether Beijing Time Peak Technology Co., Ltd. is the best fit, or whether another verified plant in the same category beats them on price / MOQ / lead time.