Filament winding places resin-impregnated continuous reinforcement over a rotating mandrel at controlled angles. Hoop and helical layers can be tailored for pressure, axial load and handling, while liners and corrosion barriers address the service fluid. The winding program, laminate calculation and cure record are therefore part of the product definition—not interchangeable factory know-how.

When this process fits

  • Pressure and gravity pipe
  • Chemical storage and process vessels
  • Cylindrical tanks and ducting
  • Repeatable axisymmetric parts

Process controls a buyer can audit

Control fieldFactory controlBuyer evidence
Design basisPressure, vacuum, axial loads, supports, nozzles and design factorApproved calculation and laminate schedule
Corrosion barrierLiner resin, surfacing veil, chopped layer and thicknessService compatibility and barrier measurement
Winding programFiber angle, bandwidth, tension and layer sequenceMachine program identity and winding log
Cure and proofGel/cure cycle, post-cure and hydrostatic testBatch cure record and witnessed test report

Common failure modes

Leakage or weeping

Likely cause: Liner defect, poor joint preparation or local dry fiber

Evidence: Holiday/leak test, hydrotest and joint procedure

Premature pressure failure

Likely cause: Wrong angle, fiber content or laminate thickness

Evidence: Winding record, thickness map and qualification test

Chemical attack

Likely cause: Incorrect resin/cure or incomplete corrosion barrier

Evidence: Resin certificate, cure test and service review

RFQ inputs before supplier matching

  1. 01Fluid composition and temperature
  2. 02Operating/design pressure and vacuum
  3. 03Diameter, length and stiffness class
  4. 04Design code and test pressure
  5. 05Fittings, joints, supports and nozzles
  6. 06Inspection hold points and documentation

Missing inputs should be recorded as deviations, not silently filled with a factory default.

Match the process, then the factory.

Send the product definition and required evidence. GetFRP will return process-fit suppliers and identify open controls.

Submit controlled RFQ